MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores
Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores
Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores
Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores
Journal Article

Poor construction, not time, takes its toll on subsidised fences designed to deter large carnivores

2017
Request Book From Autostore and Choose the Collection Method
Overview
Large carnivore conservation may be considered as successful in Sweden, as wolf (Canis lupus), lynx (Lynx lynx), brown bear (Ursus arctos), golden eagles (Aquila chrysaetos), and wolverine (Gulo gulo) populations have recovered from extinction or near extinction to viable populations during the last three decades. Particularly the wolf and lynx populations have returned at the cost of an increasing number of carnivore attacks on domestic livestock. To support coexistence between carnivores and livestock production, the Swedish authorities subsidise interventions to prevent or reduce the number of carnivore attacks. The most commonly used intervention is carnivore deterring fencing, and all livestock owners can apply for subsidies to build a fence. To receive reimbursement the fence must be approved by the authorities according to predefined criteria. An important part of any management aiming to be adaptive is evaluating interventions. In this paper we evaluate to what extent previously subsidised fences still meet the criteria 1-15 years after their approval. Of 296 fences that had received subsidies in the county of Värmland, 100 randomly selected fences were revisited in 2016. From this subsample 14% of the fences still met the initial criteria for subsidies. None of the fences that still fulfilled the criteria were more than 8 years old, whereas fences with identified failures occurred in all age groups. Of the 86 fences that failed to meet the criteria, construction failures were the most commonly occurring problem. Maintenance failures, wear and tear, only explain a minor part of the failures. To improve the quality of fencing, as well as the quality and longevity of the subsidies programme, there is a need for improved communication between authorities, and improved communication and support from the authorities to livestock producers before and during construction of fences, as well as more rigorous inspection when the fences are built.