MbrlCatalogueTitleDetail

Do you wish to reserve the book?
Study on the Minimum and Appropriate Instream Ecological Flow in Yitong River Based on Tennant Method
Study on the Minimum and Appropriate Instream Ecological Flow in Yitong River Based on Tennant Method
Hey, we have placed the reservation for you!
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Study on the Minimum and Appropriate Instream Ecological Flow in Yitong River Based on Tennant Method
Oops! Something went wrong.
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Title added to your shelf!
Title added to your shelf!
View what I already have on My Shelf.
Oops! Something went wrong.
Oops! Something went wrong.
While trying to add the title to your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Study on the Minimum and Appropriate Instream Ecological Flow in Yitong River Based on Tennant Method
Study on the Minimum and Appropriate Instream Ecological Flow in Yitong River Based on Tennant Method

Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
How would you like to get it?
We have requested the book for you! Sorry the robot delivery is not available at the moment
We have requested the book for you!
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Study on the Minimum and Appropriate Instream Ecological Flow in Yitong River Based on Tennant Method
Study on the Minimum and Appropriate Instream Ecological Flow in Yitong River Based on Tennant Method
Journal Article

Study on the Minimum and Appropriate Instream Ecological Flow in Yitong River Based on Tennant Method

2014
Request Book From Autostore and Choose the Collection Method
Overview
It has been very urgent situation that the Yitong River ecological environment gradually worsening and aquatic ecological environment restore, especially the city wastewater and wastewater emissions increased gradually, making the river self purification capacity decreased gradually. To maintain the basic ecological functions of rivers, it is very important to study the instream minimum and appropriate ecological flow. The Yitong River main control section's (Yitong Hydrology Station and Nongan Hydrologic Station) minimum and appropriate ecological flow is calculated based on Tennant method. After the Tennant method of flow standard is modified, the ecological water demand is 0.17x108m3, minimum in Yitong station, the suitable ecological water requirement is 0.23x108 m3, respectively, representing average annual flow in Yitong station 26.3% and 36.3 %. The minimum ecological water requirement of Nongan station is 0.77x108 m3, the suitable ecological water requirement is 1.13x108 m3, respectively, representing the Nong2 an station mean annual runoff 21.3% and 31.3%, providing a reference for ecological regulation of Yitong river ecological protection and restoration.

MBRLCatalogueRelatedBooks