Asset Details
MbrlCatalogueTitleDetail
Do you wish to reserve the book?
Research on Operation Efficiency Prediction and Optimization of Biological Retention System Based on GA-BP Neural Network Model
by
Zhang, Qian
, Chen, Sheming
, Yuan, Yingwei
, Chen, Feiwu
in
Algorithms
/ Analysis
/ Asian literature
/ Chinese literature
/ Cities
/ Drainage
/ Efficiency
/ English literature
/ Floods
/ Hydrology
/ Neural networks
/ Nitrogen
/ Pollutants
/ Ponds
/ Rain
/ Retention
/ Sustainability
/ Water quality
2023
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Research on Operation Efficiency Prediction and Optimization of Biological Retention System Based on GA-BP Neural Network Model
by
Zhang, Qian
, Chen, Sheming
, Yuan, Yingwei
, Chen, Feiwu
in
Algorithms
/ Analysis
/ Asian literature
/ Chinese literature
/ Cities
/ Drainage
/ Efficiency
/ English literature
/ Floods
/ Hydrology
/ Neural networks
/ Nitrogen
/ Pollutants
/ Ponds
/ Rain
/ Retention
/ Sustainability
/ Water quality
2023
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Research on Operation Efficiency Prediction and Optimization of Biological Retention System Based on GA-BP Neural Network Model
by
Zhang, Qian
, Chen, Sheming
, Yuan, Yingwei
, Chen, Feiwu
in
Algorithms
/ Analysis
/ Asian literature
/ Chinese literature
/ Cities
/ Drainage
/ Efficiency
/ English literature
/ Floods
/ Hydrology
/ Neural networks
/ Nitrogen
/ Pollutants
/ Ponds
/ Rain
/ Retention
/ Sustainability
/ Water quality
2023
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Research on Operation Efficiency Prediction and Optimization of Biological Retention System Based on GA-BP Neural Network Model
Journal Article
Research on Operation Efficiency Prediction and Optimization of Biological Retention System Based on GA-BP Neural Network Model
2023
Request Book From Autostore
and Choose the Collection Method
Overview
Bioretention systems are an important measure in sandy city construction to remove pollutants. This study collected all the operating data samples of bioretention ponds currently in operation in China and used the Mantel test and Redundancy Analysis (RDA) to optimize the main factors that affect the changes in pollutant-removal efficiency. Genetic Algorithms (GA) were used to optimize the Back Propagation (BP) neural network model, and a predictive index system was established to predict the efficiency of removing typical pollutants (ammonia nitrogen and nitrite nitrogen) by bioretention ponds. The operating efficiency of bioretention ponds was evaluated and predicted based on the GA-BP neural network model. The results indicated that the highest positive correlation with the operating efficiency of the bioretention system was X3 (rainfall duration), with a correlation coeffi-cient of 0.79, while the highest negative correlation was with X7 (percentage of strong percolating soil) and X12 (the proportion of mineral fillers), with correlation coefficients of −0.89. The overall regression coefficients of the GA-BP model for predicting the efficiency of removing typical pollu-tants (ammonia nitrogen and nitrite nitrogen) were 0.9397 and 0.9303, respectively, indicating high accuracy and representativeness. The overall regression index of the model is 0.9298, and the overall predicted removal rates of typical pollutants in the blank area are 78.72%, 70.31%, and 86.92%, re-spectively. The model can provide a basis and reference for the construction and planning of bio-retention ponds in areas lacking them.
This website uses cookies to ensure you get the best experience on our website.