Macroeconomic-aware forecasting of construction costs in developing countries: Using gated recurrent unit and long short-term memory deep learning framework
by
Ehab, Ahmed
, Soltan, Akram
, Abdou, Heba
, Alzara, Majed
, Hilal, AlHussein
, Gihad, Nadeen
in
Accuracy
/ Artificial intelligence
/ Biology and Life Sciences
/ Commodities
/ Computer and Information Sciences
/ Construction costs
/ Construction industry
/ Construction Industry - economics
/ Correlation analysis
/ Cost control
/ Costs and Cost Analysis
/ Deep Learning
/ Developing countries
/ Developing Countries - economics
/ Economic aspects
/ Economic growth
/ Economic indicators
/ Economics
/ Egypt
/ Errors
/ Financial markets
/ Financial planning
/ Forecasting
/ Forecasting models
/ Forecasting techniques
/ Forecasts and trends
/ Foreign exchange
/ Foreign exchange markets
/ Foreign exchange rates
/ GDP
/ Gross Domestic Product
/ Highway construction
/ Humans
/ LDCs
/ Literature reviews
/ Long short-term memory
/ Machine learning
/ Macroeconomics
/ Models, Economic
/ Neural networks
/ People and Places
/ Permutations
/ Physical Sciences
/ Prediction models
/ Prices
/ Project engineering
/ Reinforced concrete
/ Research and Analysis Methods
/ Social Sciences
/ Statistical analysis
/ Statistical methods
2025
Hey, we have placed the reservation for you!
By the way, why not check out events that you can attend while you pick your title.
You are currently in the queue to collect this book. You will be notified once it is your turn to collect the book.
Oops! Something went wrong.
Looks like we were not able to place the reservation. Kindly try again later.
Are you sure you want to remove the book from the shelf?
Macroeconomic-aware forecasting of construction costs in developing countries: Using gated recurrent unit and long short-term memory deep learning framework
by
Ehab, Ahmed
, Soltan, Akram
, Abdou, Heba
, Alzara, Majed
, Hilal, AlHussein
, Gihad, Nadeen
in
Accuracy
/ Artificial intelligence
/ Biology and Life Sciences
/ Commodities
/ Computer and Information Sciences
/ Construction costs
/ Construction industry
/ Construction Industry - economics
/ Correlation analysis
/ Cost control
/ Costs and Cost Analysis
/ Deep Learning
/ Developing countries
/ Developing Countries - economics
/ Economic aspects
/ Economic growth
/ Economic indicators
/ Economics
/ Egypt
/ Errors
/ Financial markets
/ Financial planning
/ Forecasting
/ Forecasting models
/ Forecasting techniques
/ Forecasts and trends
/ Foreign exchange
/ Foreign exchange markets
/ Foreign exchange rates
/ GDP
/ Gross Domestic Product
/ Highway construction
/ Humans
/ LDCs
/ Literature reviews
/ Long short-term memory
/ Machine learning
/ Macroeconomics
/ Models, Economic
/ Neural networks
/ People and Places
/ Permutations
/ Physical Sciences
/ Prediction models
/ Prices
/ Project engineering
/ Reinforced concrete
/ Research and Analysis Methods
/ Social Sciences
/ Statistical analysis
/ Statistical methods
2025
Oops! Something went wrong.
While trying to remove the title from your shelf something went wrong :( Kindly try again later!
Do you wish to request the book?
Macroeconomic-aware forecasting of construction costs in developing countries: Using gated recurrent unit and long short-term memory deep learning framework
by
Ehab, Ahmed
, Soltan, Akram
, Abdou, Heba
, Alzara, Majed
, Hilal, AlHussein
, Gihad, Nadeen
in
Accuracy
/ Artificial intelligence
/ Biology and Life Sciences
/ Commodities
/ Computer and Information Sciences
/ Construction costs
/ Construction industry
/ Construction Industry - economics
/ Correlation analysis
/ Cost control
/ Costs and Cost Analysis
/ Deep Learning
/ Developing countries
/ Developing Countries - economics
/ Economic aspects
/ Economic growth
/ Economic indicators
/ Economics
/ Egypt
/ Errors
/ Financial markets
/ Financial planning
/ Forecasting
/ Forecasting models
/ Forecasting techniques
/ Forecasts and trends
/ Foreign exchange
/ Foreign exchange markets
/ Foreign exchange rates
/ GDP
/ Gross Domestic Product
/ Highway construction
/ Humans
/ LDCs
/ Literature reviews
/ Long short-term memory
/ Machine learning
/ Macroeconomics
/ Models, Economic
/ Neural networks
/ People and Places
/ Permutations
/ Physical Sciences
/ Prediction models
/ Prices
/ Project engineering
/ Reinforced concrete
/ Research and Analysis Methods
/ Social Sciences
/ Statistical analysis
/ Statistical methods
2025
Please be aware that the book you have requested cannot be checked out. If you would like to checkout this book, you can reserve another copy
We have requested the book for you!
Your request is successful and it will be processed during the Library working hours. Please check the status of your request in My Requests.
Oops! Something went wrong.
Looks like we were not able to place your request. Kindly try again later.
Macroeconomic-aware forecasting of construction costs in developing countries: Using gated recurrent unit and long short-term memory deep learning framework
Journal Article
Macroeconomic-aware forecasting of construction costs in developing countries: Using gated recurrent unit and long short-term memory deep learning framework
2025
Request Book From Autostore
and Choose the Collection Method
Overview
Cost overruns are common on long-term construction projects. This is mostly because of inaccurate early estimates and unexpected changes in the economy and finances. In Egypt, the costs of materials like steel, cement, bricks, sand, and aggregates make up a large part of the cost of building. These costs are greatly affected by the state of the economy and the financial markets. Even though the Construction Cost Index (CCI) is a widely used economic indicator around the world, Egypt has not yet made its own CCI official. This study creates a predictive model just for Egypt’s construction industry that aims to predict a localized CCI to improve financial planning and lower risk. The framework uses two deep learning models, Long Short-Term Memory (LSTM) and Gated Recurrent Unit (GRU), to make predictions about Egypt’s CCI. The models include a wide range of macroeconomic, monetary, foreign exchange market, commodity/energy market and equity market indicators, as well as technical indicators. In Python, advanced statistical methods like correlation analysis, multicollinearity, and stepwise regression are used to make sure that the best features are chosen. The GRU is better at keeping things in balance because it wins on the calibration (Weighted Absolute Percentage Error (WAPE), Bias (mean error)), the absolute error metrics (Mean Absolute Error, Mean Absolute Percentage Error, Symmetric Mean Absolute Percentage Error, and median error), while LSTM is better at squared-loss/association and turning points (Root Mean Squared Error, Mean Squared Error, Coefficient of determination, Directional Accuracy) because it has a slightly tighter variance fit and sign tracking. There is a permutation feature importance analysis for six features in both the GRU Model and the LSTM Model that shows that oil is the most important thing that affects the construction cost index (CCI). The study shows that deep learning models can accurately predict economic indicators. This gives Egypt’s construction industry a useful, data-driven tool for estimating costs ahead of time. They make a big difference in Egypt’s construction industry and meet the need for localized forecasting models in markets.